13-529-Order Recorded 12/8/1969`v
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Vatter )
of installing an ) O R D E R
access to Arnold mkt. Rd. )
VOL 13 FACE 529
A permit is granted by Deschutes County to the City of Bend
to construct an access road on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet, this permit is subject to the following general specifications
and is revocable at,any time upon written notice by the Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
tains. to the moving of buildings. The permittee shall be required to,m the
buildings umatic dollies evenly spaced so as to insure an eve fight dis-
tribution, and p ly shored so as to prevent collapse whil the process of
mcving. The permittee 11 be responsible for all tra ` warnings to the
traveling public, -as may bessary to insure s ravel while in the process of
moving the building., The permitte all be aired to have at least two (2)
pilot cars equipped with signs depicti de Load", and all the necessary signs
and flagmen at all intersections as to ins an even flow of the traffic and
prevent congestion. The pe tee will be held dir responsible for any and
all damage to the exi ' g pavement and shoulder areas, a '11 be required to
repair said dam or pay damages to Deschutes County for the ssary repairs.
If durin course of moving, it is necessary to move bridge rails the
per ee shall be required to replace the railings to their original sta. The
Private Access to County Road:
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the descrirti_on.
If there is obvious need for a culvert, the proper size and length must be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or, construction, the permittee will be required to move this
installation at his cnen expense. Deschutes County will assume no responsibility
for damage to said installation as a result of maintenance or construction.
Failure of permittee ,to comply with performance of work will result in a charge for
work performed by Deschutes County. Azj
Dated this day of ,____ 19
Reco. nded Approve s
Charles L. Plummer
Deschutes County Roadmaster
By
rERMITTEE
VOL 13 PAUE 533
P
1/4 0� k_i e. (.1_WY4
♦ :.c, 1 a Sec. \4
lc�
i
i