Loading...
13-529-Order Recorded 12/8/1969`v IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Vatter ) of installing an ) O R D E R access to Arnold mkt. Rd. ) VOL 13 FACE 529 A permit is granted by Deschutes County to the City of Bend to construct an access road on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet, this permit is subject to the following general specifications and is revocable at,any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS tains. to the moving of buildings. The permittee shall be required to,m the buildings umatic dollies evenly spaced so as to insure an eve fight dis- tribution, and p ly shored so as to prevent collapse whil the process of mcving. The permittee 11 be responsible for all tra ` warnings to the traveling public, -as may bessary to insure s ravel while in the process of moving the building., The permitte all be aired to have at least two (2) pilot cars equipped with signs depicti de Load", and all the necessary signs and flagmen at all intersections as to ins an even flow of the traffic and prevent congestion. The pe tee will be held dir responsible for any and all damage to the exi ' g pavement and shoulder areas, a '11 be required to repair said dam or pay damages to Deschutes County for the ssary repairs. If durin course of moving, it is necessary to move bridge rails the per ee shall be required to replace the railings to their original sta. The Private Access to County Road: The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the descrirti_on. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or, construction, the permittee will be required to move this installation at his cnen expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee ,to comply with performance of work will result in a charge for work performed by Deschutes County. Azj Dated this day of ,____ 19 Reco. nded Approve s Charles L. Plummer Deschutes County Roadmaster By rERMITTEE VOL 13 PAUE 533 P 1/4 0� k_i e. (.1_WY4 ♦ :.c, 1 a Sec. \4 lc� i i