Loading...
12-604-Order Recorded 6/4/1969IN THE COUNTY COURT OF THE STATE OF OREGON VCL 12 FACE694 FOR THE COUNTY OF DESCHUTES In the Matter ) of } ORDER .Private access on ) Alfalfa Market Road A permit is granted by Deschutes County to C. W. Platz toconstruct private access on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS The ittee shall be required to observe the following rules and regulations per- taininga moving of buildings. The permittee shall be required to move the buildings on p tic dollies evenly spaced so as to insure an even weight dis- tribution, and grope shored so as to,pprevent collapse while in the process of moving. The permittee sh a responsibie for all traffic warnings to the traveling public, as may be nec ry to insure safe travel while in the process of moving the building. The pehmittee 1 be required to have at least two (2) pilot cars equipped with signs depicting Load", and all the necessary signs and flagmen at all intersections so as to ins even flow of the traffic and prevent congestion. The permittee will be held dire responsible for any and all damage to the existing pavement and shoulder areas, an 11 be required to repair said damage or pay damages to Deschutes County for the n sorry repairs. If during the course of moving, it is necessary to move bridge rail the permittee shall be required to replace the railings to their or_igival sta, The Private Access to County Road: The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County. Dated this 4th day of June 19.a-,. Recommended Approval: Charles L. Plummer Deschutey County Roach ster $y: PERMITTEE we u y C urts