A permit is granted by Deschutes County to U61 Jackson for City of Redmond
to install a 12" pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Instal ling Pipe Line Parallei: 12" steel wateriin*. All pipe lines running
paraM-51 with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
Installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
laid transversely to the road a or right-of-way s a a ns a e in
the fo manner: All pavement cuts prior to excavation shall be made with
a breaking so as to insure neat finish cut lines. All pipe lines shall
be installed to a of no less than two (2) feet below the existing road-
side ditch elevation. cases where a water line is installed in a trans-
verse direction the water pip be installed within a larger pipe which size
shall be no less than six (6) inch iameter. Backfilling and Paving: The
permittee shall be required to properly it the tre ch In such a manner as
to guarantee a well compacted, stabilized sub- rior to paving. The pave-
ment must be replaced to its original line, crown, de with an asphalt
mixture to conform with the surrounding road bed. The ar installation
must be kept smooth for the traveling public at all times. Th ttee will
be required at ail times to take every precaution to protect the tra
in regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe w n crossing the right-of-way.
Dated this_/day of 195
Recommended Approval
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER