Loading...
12-646-Order Recorded 7/2/1969VOL 12 °AGE 6461N THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) of ) O R D E R Installation of two 1118" ) pipelines A permit is granted by Deschutes County to Sydney Gross toInstal I two 18" pipelines on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS parallel oad shall be in the existing ditch line, or no less than three (3) feet from the edge isting pavement edge. All pipe lines must be installed to a depth to be no less (2) feet and properly backfilled to the original grade line and with no obstructions rainage area. Permittee shall be responsible for any or all damages to the existing p and Installing Pipe Line Transverse: 2 - 18" pipelines. All pipe line instal- ations laid transversely to he road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing road- side ditch elevation. In all cases where a water line is installed in a trans- verse direction the water pipe must be installs within a larger pipe which size shall be no less than six (6) inches in diameter. Backfillina and Paving: The permittee shall be required to properly backfill the trench in such a manner as to guarantee a well compacted, stabilized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Dated this_day of 196 As per attached sheet. Permittee is responsible for all materials and labor. Reco ended Approval, � �� r 7 Charles L. Plummer, DESCHUTES COUNTY ROADMASTER