Loading...
12-650-Order Recorded 6/25/196960 . a VA Tn the Matter of Installation of u ripedine. IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES O R D E R A permit is granted by Deschutes County to . L. hiewenecivwider to inctaZZ a 12° pipeline on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided__. on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS parallel with the road shall be in the existing ditch line s an three (3) feet from the edge of the existing pavement pipe lines must be installed to a depth to be no less feet and properly backfilled to the original grade lin no obstructions to the drainage area. Permittee shall be r e for any or all damages to the existing pavement, and Installing Pipe Line Transverse: „ pp All pipe line instal- lations laid transversely to'the road be8eor might -of -way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two .(2) feet below the existing road- side ditch elevation. In all cases where a water linea is installed in a trans- verse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly backfill the trench such a manner a to guarantee a well compacted, stabilized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground with one exception: It would not be necessary to have these lines within a larger pipe en crossing the right-of-way. Dated this qday of 19W. Recommended Approval Charles L. Plummer, DESCHUTES COUNTY ROADMASTER _ _. I