12-24-Order Recorded 6/5/1968VOL 12 ?ACE 24
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Platter )
of ) ORDER
ACCESS )
A permit is granted by Deschutes County to Sydney Gross
to Install thirteen(43) accesses on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
14Qv_ing of Buildings:
The pe. ttee shall be required to observe the foling rules and regulations per-
taining to moving of buildings. The perms shall be required to moire the
buildings on pne tic dollies evenly spac so as to insure an even weight dis-
tribution, and prope shored so as t revent collapse while in the process of
moving. The permittee s be re sible for all traffic warninge to the
traveling public, as may be n saty to insure safe travel while in the process of
moving the building. The tie hall be required to have at least two (2)
pilot cars equipped wi gins depicti "Wide Load", and all the necessary signs
and flagmen at all ersedtions so as to an even flaw of the traffic and
prevent congest The permittee will be hel ctly responsible for any and
all damage t e existing pavement and shoulder and will be required to
repair sa' damage or pay damages to Deschutes County he necessary repairs.
If du r g the course of moving, it is necessary to move bri ailings, the
per tee shall be required to replace the railings to their oz.s l state. The
ing off of posts and railings will not be permitted.
Private Access to County Road: See reverse side for details
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the description.
If there is obvious need for a culvert, the proper size and length must be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or construction, the permittee will be required to move this
installation at his own expense. Deschutes County will assume no responsibility
for damage to said installation as a result of maintenance or construction.
Failure of permittee to comply with performance of work will result in a charge for
work performed by Deschutes Cou
Dated this= day of { n 19
Recommended Approval:
Charles L. Plummer
Desc71A4_L
ty Roadmaster
Bar :
ERMIT
First Addition To Whispering Pines Estates
To install accesses on Lots 6-18 inslusive, on Block 2.