12-25-Order Recorded 6/5/1968VOL 12 PACE 25
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter
of ) ORDER
To move a building
A permit is granted by Deschutes County to Ken Holman
to nave a building on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Moving of Buildings: see reverse d side for details
The permittee shall be required to observe the following rules and regulations per-
taining to the moving of buildings. The permittee shall be required to move the
buildings on pneumatic dollies evenly spaced so as to insure an even weight dis-
tribution, and properly shored so as to prevent collapse while in the process of
moving. The permittee shall be responsible for all traffic warnings to the
traveling public, as may be necessary to insure safe travel while in the process of
moving the building, The permittee shall be required to have at least two (2)
pilot cars equipped with signs depicting "Wide Load", and all the necessary signs
and flagmen at all intersections so as to insure an even flow of the traffic and
prevent congestion. The permittee will be held directly responsible for any and
all damage to the existing pavement and shoulder areas, and will be required to
repair said damage or pay damages to Deschutes County for the necessary repairs.
If during the course of moving, it is necessary to move bridge railings, the
Permittee shall be required to replace the railings to their original state. The
sawing off of posts and railings will not be permitted.
nj�Late Access to County Roads
The pe 2e will be required to construct the acces the safest and most
practical po of entry. The size of the acces st be noted on the description.
If there is obviou ed for a culvert, the per size and length must be deter-
mined, and also include the descri n. The permittee will be responsible
for the construction of the s d all the costs of the materials used in the
access. If at any time this, sta ' ion in any way impedes the progress and
future maintenance or c ruction, the ittee will be required to move this
installation at h n expense. Deschutes ty will assume no responsibility
for damage t d installation as a result of m Hance or construction.
Failure permittee to comply with performance of wor '1.I result in a charge for
work pc`rformed, by /DeschutesCo ty.
Dated this ��� r' day of z-� 19=�.
Recommended Approvals
Charles L. Plummer
Deschutes Co ty Roa as r
F
Moving of Spring River Bunkhouse No. 01-1319
As per attached snap.