Loading...
12-52-Order Recorded 6/19/1968VOL 12 PAGE 52 IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the batter ) of ) ORDER building of an access A permit is granted by Deschutes County to Paul Ellis to build an access on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS The ittee shall be required to observe the following rules and regulations per- taining tomoving of buildings. The permittee shall be required to move the buildings on pn is dollies evenly spaced so as to insure an even weight dis- tribution, and proper ored so as to prevent collapse while in the process of moving. The permittee sha responsible for all traffic warnings to the traveling public, as may be nece to insure safe travel while in the process of moving the building. The permittee sEgM. be required to have at least two (2) pilot cars equipped with signs depicting " ad", and all the necessary signs and flagmen at all intersections so as to insure en flow of the traffic and prevent congestion. The permittee will be held direct onsible for any and all damage to the existing pavement and shoulder areas, and be required to repair said damage or pay damages to Deschutes County for the nece repairs. If during the course of moving, it is necessary to move bridge railings, e permittee shall be required to replace the railings to their or3_ginal state. sa"Aff 04's a; P8068 and re+iingq "ft! meb be periftbed. no culvert necessary Private Access to County R.Oad:(See attached map for details) on right-of-way. The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes Coun Dated this day of 19d