12-52-Order Recorded 6/19/1968VOL 12 PAGE 52
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the batter )
of ) ORDER
building of an access
A permit is granted by Deschutes County to Paul Ellis
to build an access on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Court,
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
The ittee shall be required to observe the following rules and regulations per-
taining tomoving of buildings. The permittee shall be required to move the
buildings on pn is dollies evenly spaced so as to insure an even weight dis-
tribution, and proper ored so as to prevent collapse while in the process of
moving. The permittee sha responsible for all traffic warnings to the
traveling public, as may be nece to insure safe travel while in the process of
moving the building. The permittee sEgM. be required to have at least two (2)
pilot cars equipped with signs depicting " ad", and all the necessary signs
and flagmen at all intersections so as to insure en flow of the traffic and
prevent congestion. The permittee will be held direct onsible for any and
all damage to the existing pavement and shoulder areas, and be required to
repair said damage or pay damages to Deschutes County for the nece repairs.
If during the course of moving, it is necessary to move bridge railings, e
permittee shall be required to replace the railings to their or3_ginal state.
sa"Aff 04's a; P8068 and re+iingq "ft! meb be periftbed.
no culvert necessary
Private Access to County R.Oad:(See attached map for details) on right-of-way.
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the description.
If there is obvious need for a culvert, the proper size and length must be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or construction, the permittee will be required to move this
installation at his own expense. Deschutes County will assume no responsibility
for damage to said installation as a result of maintenance or construction.
Failure of permittee to comply with performance of work will result in a charge for
work performed by Deschutes Coun
Dated this day of 19d