Loading...
12-54-Order Recorded 6/27/1968VOL 12 ?AGE 54 1N THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) of ) ORDER A permit is granted by Deschutes County to �,e,aa�u° lle, &. J e, to on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS The ittee shall be required to observe the following rules and regulations per- taining moving of buildings. The permittee shall be required to move the buildings on pn tic dollies evenly spaced so as to insure an even weight dis- tribution, and prope hored so as to prevent collapse while in the process of moving. The permittee sha a responsible for all traffic warnings to the traveling public, as may be necUtreW to insure safe travel while in the process of moving the building. The permittee s be required to have at least two (2) pilot cars equipped with signs depicting Load", and all the necessary signs and flagmen at all intersections so as to insure ven flow of the traffic and prevent congestion. The permittee will be held direc I esponsible for any and all damage to the existing pavement and shoulder areas, and be required to repair said damage or pay damages to Deschutes County for the nec y repairs. If during the course of moving, it is necessary to move bridge railing , e permittee shall be required to replace the railings to their original state. e _Private Access to County Roads The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his awn expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes Co y. Dated this day of Reco ended Approvals Appro C. Charles X Plummer COUN Deschutes County Roadmaster By: FERMITTEE — ---- •