Loading...
12-55-Order Recorded 6/10/1968VOL 12 ?AGE 55 1N THE, COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES Tn the Matter of ) ORDER Installation of pipe line A permit is granted by Deschutes County to Uel Jackson (City of Redmond) to install a water line on or across Deschutes County right-of-way, A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Pipe Line Parallel: dot& I I s - reverse side All pipe lines running para el with the road all be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way, at laid transversely to the road bed or right-of-way shall be installe . the fol g manner: All pavement cuts prior to excavation shall be made with a breaking er so as to insure neat finish cut lines. All pipe lines shall be installed t depth of no less than two .(2) feet below the existing road- side ditch elevaIn all cases where a water line.' is inshalled in a trans- verse direction the ter pipe must be installed within a larger pipe which size shall be no less than (6) inches in diameter. Backfilling and Paving: The permittee shall be requir to properly backfill therenc`h 1n such a manner as to guarantee a well compact stabilized sub -base prior to paving. The pave- ment must be replaced to its o 'nal line, crown, and grade with an asphalt mixture to conform with the surr ding road bed. The area of installation must be kept smooth for the travels ublic at all times. The permittee will be required at all times to take ever ecaution to protect the traveling public. All signs and traffic controls 11 be furnished by the permittee. In regard to other utility installations, sucfNks gas lines, telephone lines and electric conduits, all the general specification hall apply if they are to be run under ground, with one exception: It would no a necessary to have these Dated this_12__day of Jung 1968. Recommended Approval Approved Co ourt: /� Charles L. Plummer, ," / .n f .,., o DESCHUTES COUNTY ROADMASTER e LLL 0. FERMITTEE t To install proposed pipe line 10" Approximately 6454 feet in length aison Canal Blvd. Burled 30" below grade 141 west of center i i ne of ted note: Map of exact location Is on file at Deschutes County Road Department.