Loading...
12-75-Order Recorded 7/9/1968VOL 12 PAGE 75 1N THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) of ) ORDER Wilding of an access ) A permit is granted by Deschutes County to Lamar Van Tassel to build an access on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS of taining to the moving of buildings. The permittee shall be required to move. e buildings on pneumatic dollies evenly spaced so as to insure an even wsfght dis- tribution, and properly shored so as to prevent collapse while �n-the process of moving. The permittee shall be responsible for all traffic -Warnings to the traveling public, as may be necessary to insure safe_ -travel while in the process of moving the building. The permittee shall be r,equired to have at least two (2) pilot cars equipped with signs depictin 'fid", and all the necessary signs o and flagmen at all intersections s insure an even flow of the traffic and prevent congestion. The per,l e—e' will be held directly responsible for any and all damage to the existing -pavement and shoulder areas, and will be required to repair said damags--ter-pay damages to Deschutes County for the necessary repairs, If during_tnurse of moving, it is necessary to move bridge railings, the permi shall be required to replace the railings to their original state. The Private Access to County Roads See reverse side for details The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his sawn expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County4 Dated this � day of Recommended Approvals Charles L. Plummer Deschutes County Roadmaster rERDETTEE 19 5