Loading...
12-191-Order Recorded 7/17/1968IN THE COUNTY COURT OF THE STATE OF OREGON Tu the Matter of Installation of pipe. FOR THE COUNTY OF DESCHUTES ) O R D E R VOL 12 PAGE 191 A permit is granted by Deschutes County to M. Clsvolsnd to install pips on or across Deschutes County right-of-way. A detjiled description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS parallelww the road shall be in the existing ditch line, or no less than three (3) fee a of the existing pavement edge. All pipe lines must be installed to a depth to a two (2) feet and properly backfilled to the original grade line and with no obstruc drainage area. Permittee shall be responsible for any or all damages to the existing pa d Installing Pipe Line Transverse:gN reverse side. All pipe line instal- lations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two 42) feet below the existing road- side ditch elevation. In all cases where a water line." is installed in a trans- verse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly backfill the trenchsuch a manner as to guarantee a well compacted, stabilized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Dated this 17 day of JVly 19E8_. red Co: r Recommended Approval Charles L. Plummer, DESCHUTES COUNTY ROADMASTER To Install 111 /2"wot*r p 1 pe vertically across Boyd's Acre Rand