Loading...
12-247-Order Recorded 9/18/1968Tu the Matter Of Installation of Pipellns IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES O R D E R VOL 12 PAGE 24'7 install 1 granted by Deschutes County to Don W. Sax"re to p l0 ni on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Pipe Line Parallel:(DotelIs on Rmorse Ski`s) All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way, lations laid transversely to the road bed or right-of-way shall be ins ed in the following manner: All pavement cuts prior to excavation shall made with a breaking hammer so as to insure neat finish cut lines. All pxpe lines shall be installed to a depth of no less than two 42) feet below e exisuing road- side ditch elevation. In all cases where a water line. S' installed in a trap .- verse direction the water pipe must be installed w' n a larger pipe which size shall be no less than six (6) inches in diamet . Backfilling and 'Paving: The permittee shall be required to properly ba 11 the trench n such a manner as to guarantee a well compacted, stabili sub -base prior to paving. The pave- ment must be replaced to its origi line, crown, and grade with an asphalt mixture to conform with the sur nding road bed. The area of installation must be kept smooth for the aveling public at all times. The permittee will be required at all time o take every precaution to protect the traveling public. All signs traffic controls shall be furnished by the permittee. In regard t ther utility installations, such as gas lines, telephone lines and electri onduits, all the general specifications shall apply if they are to be run der ground, with one exception: It would not be necessary to have these Dated this /�-4'`"day of Approved County Court: 196. Recommended Approval Charles L. Plummer, DESCHUTES COUNTY ROADMASTER FERMITTEE