Loading...
12-248-Order Recorded 9/24/1968VOL 12 PAGE 248 IDT THE COUNTY COURT OF THE STATE OF OREGON 61� FOR THE COUNTY OF DESCHUTES Tu the Matter ) of ) ORDER Installing a Pipeline ) A permit is granted by Deschutes County to Neil Nollau to install a pipeline on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS parallel with the road shall be in the existing ditch li,e s han three (3) feet from the edge of the existing paveme pipe lines must be installed to a depth to be no 1 feet and properly backfilled to the original grade no obstructions to the drainage area. Permittee shall e for arty or all damages to the existing pavement, and Installin Pipe bine Transverse:(See reverse side) All pipe line instal- lations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two 42 ) feet below the existing 1•oa.d- side ditch elevation. In all cases where a water line. as installed in a tran4 verse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly backfill the trench insuch a manner as to guarantee a well compacted, stabilized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-o.f-way. Dated this_27 of f 196 _t. Recommended Approval Charles L. Plummer, DESCHUTES COUNTY ROADMASTER