Loading...
12-249-Order Recorded 9/18/1968Tu the Matter of Instal lotion Of PipolIna VOL IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES } ORDER. } 1.2 ?acc 249 A permit is granted by Deschutes County to Roy Edwards to install a p1pellnu on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following gen- eral specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Installing Pipe Line Parallel: (Dotal ls on rwerso aside) All pipe lines running parallel with the road shall be in the existing ditch line, or rJo less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be installed to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area, Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. Installing Pipe Line Transverse: All pipe line instal- lations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two 42 ) feet below the exi s to ng i•oa.d- side ditch elevation. In all cases where a water linea id installed in a trans verse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly backfill the trench insuch a manner as to guarantee a well compacted, stabilized sub -base prior to paving. The pave- ment must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permittee. In regard to other utility installations, such as gas lines, telephone lines End electric conduits, all the general specifications shall apply if they are to be run under ound with one exception• It would not be necessary to have these VDI , - lines within a larger pipe w crossing the right- Dated this_�day of 196 Recommended Approval Charles L, Plummer, DESCHUTES COUNTY ROADMASTER � 1 AWF�AOAZOWOPRM