Loading...
12-251-Order Recorded 9/18/1968VOL 12 ?AGE 251 IN THE COUNTY COURT OF TIME STATE OF OREGON FOR THE COUNTY OF DESCHUTES i1 - In the Matter ) of ) ORDER II it Moving Building ) 16' x l8' ) A permit is granted by Deschutes County to Kenneth Holman to move a building on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Moving,of Buildings: NgXXX Details on reverse side The permittee shall be required to observe the following rules and regulations per- taining to the moving of buildings. The permittee shall be required to move the buildings on pneumatic dollies evenly spaced so as to insure an even weight dis- tribution, and properly shored so as to prevent collapse while in the process of moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessary to insure safe travel while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all intersections so as to insure an even flow of the traffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the existing pavement and shoulder areas, and will be required to repair said damage or pay damages to Deschutes County for the necessary repairs, It during the course of moving, it is necessary to move bridge railings, the permittee shall be required to replace the railings to their original state. The sawing off of posts and railings will not be permitted. The permittee will be required to construct the access at the safest ost practical point of entry. The size of the access must be no Y' the description. If there is obvious need for a culvert, the proper s' length must be deter- mined, and also included on the description. ermittee will be responsible for the construction of the access an a costs of the materials used in the access. If at any time this i ation in any way impedes the progress and future maintenance or co ction, the permittee will be required to move this installation at n expense. Deschutes County will assume no responsibility for dama aid installation as a result of maintenance or construction# of permittee to comply with performance of work will result in a charge for Dated this L_f day of 421 lq_ Rec ended Approval: Charles L. Plummer Deschutes Coun Ro master a Dy: -- P T