12-273-Order Recorded 10/3/1968VOL 12 PACE 273
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
Tn bhe Matter )
of ) ORDER
Installing a pipeline )
Riemenschneider
A permit is granted by Deschutes County to R. L. RK (o(XdW*I( cJ
to install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheat. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
parallel with the road shall be in the existing ditch line an three
(3) feet from the edge of the existing pavemen p pe lines must be
installed to a depth to be no les feet and properly backfilled to
the original grade 1 o obstructions to the drainage area. Permittee
shall be or any or all damages to the existing pavement, and
Srows* side) Pipe Line Transverse:(S99 attached map) All pipee line instal-
lations laid transversely to the road bed or right-of-way shall be installed in
the following manner: All pavement cuts prior to excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two 42) feet below the exi s W ng roa.rl-
side ditch elevation. In all cases where a water line. is installed in a trarns-
verse direction the water pipe must be installed within a larger pipe which size
shall be no less than six (6) inches in diameter. Backfilling and Paving: The
permittee shall be required to properly backfill the trenchin such a manner as
to guarantee a well compacted, stabilized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated thie-&'jday of� � 19V.
ReJommended Approval
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
�� wplw000,.,
6" Pipeilne - 5' Deep. 1,000 feet off Lower Bridge Road.