12-274-Order Recorded 10/3/1968VOL 12 ?AGE 274
IN THE COUNTY COURT OF THE STATE OF OREGON
In the Matter
of
Building of an Access
FOR THE COUNTY OF DESCHUTES
O R D E R
Riemenschneider
A permit is granted by Deschutes County to R. L.+�FRk34�ftR
to build an access on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifications
and is revocable at any time upon written notice by the Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
The permittee shall be required to observe the following rules and regulat er-
taining to the moving of buildings. The permittee shall be required a the
buildings on pneumatic dollies evenly spaced so as to insure an weight dis-
tribution, and properly shored so as to prevent collapse n the process of
moving,. The permittee shall be responsible for all c warnings to the
traveling public, as may be necessary to insur travel while in the process of
moving the building. The permittee shall quired to have at least two (2)
pilot cars equipped with signs depi` ide Load", and all the necessary signs
and flagmen at all intersectio as to insure an even flow of the traffic and
prevent congestion. The tee will be held directly responsible for any and
all damage to the pavement and shoulder areas, and will be required to
repair said d or pay damages to Deschutes County for the necessary repairs.
If Burin course of moving, it is necessary to move bridge railings, the
pe a shall be required to replace the railings to their original state. The
Private Access to County Roads (See attached map)
The permittee will be required to construct the access at the safest and most
practical point of entry. The size of the access must be noted on the description.
If there is obvious need for a culvert, the proper size and length must be deter-
mined, and also included on the description. The permittee will be responsible
for the construction of the access and all the costs of the materials used in the
access. If at any time this installation in any way impedes the progress and
future maintenance or construction, the permittee will be required to move this
installation at his awn expense. Deschutes County will assume no responsibility
for damage to said installation as a result of maintenance or construction.
Failure of permittee to comply with performance of work will result in a charge for
work performed by Deschutes Co Y.
Dated this day of 19,g69
Recommended Approval:
Charles L. Plummer
Deschutes County Roadmaster
A,
By:
4
�°EI3NIT'T