11-566-Order Recorded 2/21/1968VOL 11 'AGE 566
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
Tri the Matter )
of ) ORDER
Installation of water
pipe line
A permit is granted by Deschutes County to Kenneth J. Neel
to install a 2" water line on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pi e Line Parallel: All pipe lines running
para lel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
lat laid transversely to the road bed or right-of-way shall be installed in
the fol 'ng manner: All pavement cuts prior to excavation shall be made with
a breaking er so as to insure neat finish cut lines. All pipe lines shall
be installed topth of no less than two 42) feet below the existing road-
side ditch elevation. n all cases where a water linea is installed in a tran4--
verse direction the water a must be installed within a larger pipe which size
shall be no less than six (6 ches in diameter. Backfilling and Paving: The
permittee shall be required to pr ly backfill the trench insuch a manner as
to guarantee a well compacted, stabile sub -base prior to paving. The pave-
ment must be replaced to its original line, rown, and grade with an asphalt
mixture to conform with the surrounding road b The area of installation
must be kept smooth for the traveling public at al es. The permittee will
be required at all times to take every precaution to p ct the traveling
public. All signs and traffic controls shall be furnished the permittee.
In regard to other utility installations, such as gas lines, teleph lines and
electric conduits, all the general specifications shall apply if they o be
run under ground, with one exception: It would not be necessary to have
Men. cross ng the right-of-way*
Dated this :2- day of,, 1960
Rec ended Approv,�l
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER