12-361-Order Recorded 11/26/1968Tn the Matter
WN
Installation of a
Pipeline
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
O R D E R
VOL 12 MAR
A permit is granted by Deschutes County to City of Redwnd
to Install a pipeline on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing P:2Le Line Parallel A See attached map) All pipe lines running
parallel with the road s all be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
la laid transversely to the road bed or right-of-way shall be installed n
the fo. 'ng manner: All pavement cuts prior to excavation shall be made with
a breaking er so as to insure neat finish cut lines. All pipe lines shall
be installed to epth of no less than two 42) feet below the ex .sting 1-nad-
side ditch elevatio In all cases where a water line.' is instfl_led in a trax,9
verse direction the wa ipe must be installed within a larger pipe which size
shall be no less than six 'nches in diameter. Backfilling and Paving: The
permittee shall be required to erly backfill the trench in such a manner as
to guarantee a well compacted, stab ' ed sub -base prior to paving. The pave-
ment must be replaced to its original crown, and grade with an asphalt
mixture to conform with the surrounding r d. The area of installation
must be kept smooth for the traveling public a times. The permittee will
be required at all times to take every precaution otect the traveling
public. All signs and traffic controls shall be furni by the permittee.
In regard to other utility installations, such as gas lines, to one lines and
electric conduits, all the general specifications shall apply if th e to be
run under ground, with one exception: It would not be necessary to hav ese
Dated this_day of 196.
Recommended Approval
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER