Loading...
12-364-Order Recorded 11/18/1968VOL In the Hatter 12 PAGE364 IN THE COUNTY COURT OF THE STATE OF OREGON of Iaetaili" lc" Waur pipe lins It'ar*Uol 16,and ,-tmahpyerak. with College Way. FOR THE COUNT Y OF D23CHUT S O R D E R A }permit is graanted by Deschutes County to Ci of Bond to �t,Z 12" Wa pipe Unq on or across Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. Gtr RAL SPECIFICATIONS FOR P MICUTAR Ii`aTALLATIONS Installing 1,ipe Line Parallel: 12" Water Main Pipe Line All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the exisL1tg:` retia edea j -,Aid pipe lines must be in- stualled to a depth to be no less than two (2) feet and properly backfilled to the o:-^iginal grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or o:.her objects or areas within the right-of-way. installing Pie Line Transverse:12" 'dater Main Pipe Line All pipe line insta.11nfJ oi- 1�id transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer o as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation. In all cases where a water line is installed in a transverse direction the Z,,Ster pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly back- fill the trench in such a manner as to guarantee a well compacted, stabilized sub- base prior to paving. The pavement must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permit- tee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Approved County Court: Recoominended Approval � Charles L. Plummer, Roaclmaster DESCIMT +S MUNPY m �� VOL 1? WE 365