Loading...
11-595-Order Recorded 4/2/1968IN THE COUNTY COURT OF THE STATE OF OREGON In the Matter of Moving a Building A permit i to move a building detailed descriptio sids of this sheet. and is revocable at FOR THE COUNTY OF DESCHUTES ORDER ) VOL 11 ?ACE595 1 4P 68 Fy, �0 c s granted by Deschutes County to Carl Spencer 26X34' on or across Deschutes County right-of-ways A n and map of this operation must be provided on the reverse This permit is subject to the following general specifications any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Moving of Buildings: See reverse side for details. The permittee shall be required to observe the following rules and regulations per- taining to the moving of buildings. The permittee shall be required to move the buildings on pneumatic dollies evenly spaced so as to insure an even weight dis- triblition, and properly shored so as to prevent collapse while in the process of moving. The permittee shall be responsible for all traff":c warnings to the traveling public, as may be necessary to insure safe travel while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and fla�nen at all intersections so as to insure an even flow of the traffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the existing pavement and shoulder areas, and will be required to repair said damage or pay damages to Deschutes County for the necessary repairs, If during the course of moving, it is necessary to move bridge railings, the permittee shall be required to replace the railings to their original state. The sawing off of posts and railings will not be permitted. Private Access to County Road: Y1 permTE ea will be required to construct the access at the safest and most practical point of entry, The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be dater - mined, and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his own expense, Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County. /t- Recommended Dated this day of 19CApproval: Approved Count 0t: Charles L. Plummer COUN Deschutes Count Ro ster CO UD CoPIS OVER PERMIT COUNTY C0 SIONER