Loading...
11-625-Order Recorded 4/11/1968VOL 11 ?AGE 625 IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) ) of } ORDER Installation of an access ) A permit is granted by Deschutes County to Dick Atchison to q nstruct private access on or across Deschutes County right-of-way. A detai�ed descr�pti.on and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS The permittee shall be required to observe the following rules and regula:Ve io er- taining to the moving of buildings. The permittee shall be required to the buildings on pneumatic dollies evenly spaced so as to insure an a weight dis- tribution, and properly shored so as to prevent collapse w n the process of moving. The permittee shall be responsible for all tSaAMc warnings to the traveling public, as may be necessary to insure travel while in the process of moving the building. The permittee shall b equired to have at least two (2) pilot cars equipped with signs depict' 'Wide Load", and all the necessary signs and flagmen at all intersection as to insure an even flow of the traffic and prevent congestion. The tee will be held directly responsible for any and all damage to the ng pavement and shoulder areas, and will be required to repair said d or pay damages to Deschutes County for the necessary repairs. If durin course of moving, it is necessary to move bridge railings, the pe bee shall be required to replace the railings to their ora ginal state. The _Private Access to County Road: The permittee will be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the description. If there is obvious need for a culvert, the proper size and length must be deter- mined., and also included on the description. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this installation at his sawn expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County. Dated this day of ZUtze_ 19�:5�► All pipe and material will be furnished by Permittee. VOL 11 FACE 626