IN THE COUNTY COURT OF TEE ST111E OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter
of ) ORDER
Power Cable Crossing
A permit is granted by Deschutes County to CENTRAL ELECTRIC COOP
to INSTALL AN UNDERGROUND CABLE on or across Deschutes County right-of-way. A de-
', --ailed description and map of this operation must be provided on the reverse side of
this sheet. This permit is subject to the following general specifications and is
vocable at any time upon written notice by the Deschutes County Court.
GL'IZRAL SPECIFICATIONS FOR PARTICULAR !13TALLATIONS
Installing Pipe Line Parallel: All pipe lines running
,-)a.rallel with the road shall be in the existing ditch line, or no less than thres
(3) feet from the edge of the existing pavement ed -e. All pipe lines must be in-
s'l-alled to a depth to be no less than two (2) feet and properly backfilled to the
^:riginal grade line and with no obstructions to the drainage area. Permittee stall
Oe responsible for any or all damages to the existing pavement, and shoulders or
other objects or areas within the right-of-way.
Underground cable transversing the Camp Polk Rodd
Installing Pipe Line Transverse: All pipe line instal Int; c--yn-
laid transversely to the road bed or right-of-way shall be installed in the following
manner: All pavement cuts prior to excavation shall be made with a breaking hammer
--o as to insure neat finish cut lines. All pipe lines shall be installed to a depth
of no less then two (2) feet below the existing roadside ditch elevation. In all
cases where a water line is installed in a transverse direction the Crater pipe must
o installed within a larger pipe which size shall be no less than six (6) inches in
diameter. Backfilling and Paving: The permittee shall be required to properly back-
fill the trench in such a manner as to guarantee a well compacted, stabilized sub-
13ase prior to paving. The pavement must be replaced to its original line, crown,
and grade with an asphalt mixture to conform with the surrounding road bed. The
area of installation must be kept smooth for the traveling public at all times. The
permittee will be required at all times to take every precaution to protect the
"raveling public. All signs and traffic controls shall be furnished by the permit-
tee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the -ensral specifications shall apply if they are to be run
under ground, with one exception: It would not be necessary- to have these lines
within a larger pine when crossing the right-of-way.
Recormended Approval
Dated this day of , . 1966.
Approved Count ort: Charles L. Plummer Roadma.st.er
pp y Court: ,
DLSCIIIIT., S COITNl'Y
COUNTY JUDGE