11-75-Order Recorded 2/6/1967VOL
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) ORDER
A PIM LIM)
11 'AGE 75
A permit is granted by Deschutes County to VBRRIT A. ROWMR
to LLBU11 a 4* valbor 11" on or across Deschutes County
right-of-way. A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
24th Rt t - Rend R41 �r
InstallingFi e Line Parallel: A 40 Yt er LI►s. All pipe lines running
tarallelwith the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right -of --way.
I.AA601A $sem • Rodama Roubt•
Installing Pipe Line Transverse: A 4* W&V010 LIA*• All pipe line instal-
lations laid transversely to the road bed or right-of-way shall be installed in
the following manner: All pavement cuts prior to excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two 42) feet below the existing road-
side ditch elevation. In all cases where a water line." 16 installed in a trans-
verse direction the water pipe must be installed within,a larger pipe which size
shall be no less than six (6) inches in diameter. Backfilling and Paving: The
permittee shall be required to properly backfill the trench insuch a manner as
to guarantee a well compacted, stabilized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall'apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this_ day
of CL/ ✓ uc.0-tom 196 .
Recommended Approval
Charles L, Plummer,
DESCHUTES COUNTY ROADMASTER
RoUte 1 Roar 364
VOL 1 FmE 7
LOT 1 e L.K. 2