Loading...
11-94-Order Recorded 2/27/1967vol 11 wE 94 IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Natter Of ) 0 R P E R CONSTRUCTION OF A PRIVATE ACCESS ) A permit is granted by Deschutes County to Laurence Mendoza to construct a private access, on or across Deschutes County right-of-way. A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifica- tions and is revocable at any time upon written notice by the Deschutes County Court, GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS a-eS-�i3�c�:ag�t___�e#•tee•--��e-�i.�+e�.-�',o-abee�we-#rl�e-�o-13�3.�g e and regulations pertaining to the moving of buildings. The perm shall be required to move the building on pneumatic dollies evenly spaces so as sure an even weight distribution, and properly shored so as to prevent collapse wh in the process of moving. The permittee shall be respon- sible for all traffic w s to the traveling public, as may be necessary to insure safe travel while in rocess of moving the building. e shall be required to have at lea two (2) pilot cars equipped with signs depicting 'Wide Load".9 and all the nece signs and flagmen at all intersec- tions so as to insure an even flow of the tr c and prevent congestion. The permittee will be held directly responsible fo and all damage to the existing pavement and shoulder areas, and will be ed to repair said damage or pay damages to Deschutes County for the necessary irs. If during the course of moving, it is necessary to move bridge railings, a permittee shall be required to replace the rai]yings to their original state. awing _ _a -0 ---.L- -3 —..!'1 ! «n... • 4.I .1 I—M------------------------ Access to Northwest Market Road Private Access to County Roads The per�jtteeiwill be required to construct the access at the safest and most practical point of entry. The size of the access must be noted on the map. If there is obvious need for a culvert, the proper size and length must be determined, and also put on the map. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at art time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this instal- lation at his ob,n expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County. R7qmended ;APT Charles L. Plwddebr, Roadmaster DESCHUTES COUNTY •14401115 o MR By.. sazz ,/ TTEE �� VOL "AGE 95 T