11-94-Order Recorded 2/27/1967vol 11 wE 94
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Natter
Of ) 0 R P E R
CONSTRUCTION OF A
PRIVATE ACCESS )
A permit is granted by Deschutes County to Laurence Mendoza
to construct a private access, on or across Deschutes County right-of-way.
A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifica-
tions and is revocable at any time upon written notice by the Deschutes County
Court,
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
a-eS-�i3�c�:ag�t___�e#•tee•--��e-�i.�+e�.-�',o-abee�we-#rl�e-�o-13�3.�g
e and regulations pertaining to the moving of buildings.
The perm shall be required to move the building on pneumatic dollies evenly
spaces so as sure an even weight distribution, and properly shored so as to
prevent collapse wh in the process of moving. The permittee shall be respon-
sible for all traffic w s to the traveling public, as may be necessary
to
insure safe travel while in rocess of moving the building. e
shall be required to have at lea two (2) pilot cars equipped with signs
depicting 'Wide Load".9 and all the nece signs and flagmen at all intersec-
tions so as to insure an even flow of the tr c and prevent congestion. The
permittee will be held directly responsible fo and all damage to the
existing pavement and shoulder areas, and will be ed to repair said
damage or pay damages to Deschutes County for the necessary irs. If during
the course of moving, it is necessary to move bridge railings, a permittee
shall be required to replace the rai]yings to their original state. awing
_ _a -0 ---.L- -3 —..!'1 ! «n... • 4.I .1 I—M------------------------
Access to Northwest Market Road
Private Access to County Roads The per�jtteeiwill be required to construct the
access at the safest and most practical point of
entry. The size of the access must be noted on the map. If there is obvious
need for a culvert, the proper size and length must be determined, and also put
on the map. The permittee will be responsible for the construction of the
access and all the costs of the materials used in the access.
If at art time this installation in any way impedes the progress and future
maintenance or construction, the permittee will be required to move this instal-
lation at his ob,n expense. Deschutes County will assume no responsibility for
damage to said installation as a result of maintenance or construction. Failure
of permittee to comply with performance of work will result in a charge for
work performed by Deschutes County.
R7qmended ;APT
Charles L. Plwddebr, Roadmaster
DESCHUTES COUNTY
•14401115 o MR
By.. sazz ,/
TTEE ��
VOL "AGE 95
T