10-476-Order Recorded 8/31/1966VOL 10 PAGE 476
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter
Of ORDER
Construction of a
Private Access
A permit is granted by Deschutes County to John F. Dorsch
to construct a private access on or across Deschutes County right-of-way, A
detailed description and map of this operation must be provided on the reverse -
aide of this sheet. This permit is subject to the following general speciflaa-
tions and is revocable at anq time upon written notice by the Deschutes County
Court.
SAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
-- ___ and regulations pertaining to the moving of buildings.
The pato a shall be required to move the building on pneumatic dollies evenly
spaces so as sure an even weight distribution, and properly shored so as to
prevent collapse w in the'prooess of moving. The permittee shall be respon-
sible for all traffic wa s to the traveling public, as may be necessary to
insure safe travel while in ocess of moving the building, The permittee
shall be required to have at lea o (2) pilot cars equipped with signs
depicting "Wide Load"9 and all the nece Isigns and flagmen at all intersec-
tions so as to insure an even flow of the tr and prevent congestion. The
permittee will be held directly responsible` for and all damage to the
existing pavement and shoulder areas, and will be re d to repair said
damage or pay damages to Deschutes County for the necessary re If during
the course of moving, it is necessary to move bridge railings, ermittee
shall be required to replace the railings to their original state. The ng
Pengrar-Huntington Road
Private Access to County Roadt The permittee will be required to construct the
access at the safest and most practical point of
entry, The size of the access must be noted on the map. If there is obvious
need for a culvert, the proper size and length must be determined, and also put
on the map. The permittee will be responsible for the construction of the
access and all the costs of the materials used in the access.
If at ary time this installation in arty way impedes the progress and future
maintenance or construction, the permittee will be required to move this instal-
lation at his ovn.expe.use., Deschutes County will assume no responsibility for
damage to said installation as a result of maintenance or construction. Failure
of permittee to comply with performance of work will result in a charge for
work performed by Deschutes County.
Dated this_,;?/�day of u,S7G 1966,
c en c"i`7�p
e�ummer, Roadmaster
DESCHUTES COUNTr
VOL 10 PAGE 477
{
1