10-515-Order Recorded 9/20/1966IN THE COUNTY COUM OF THE SWr.TL OF OREGON
FOR THE COUNTY OF DESCHUTLS
In the Matter
of
Inststutus et 4 WSW UW
O R D E R
VOL 10 FACE 515
A permit is granted by Deschutes County to WS, s
to t 24 MAWUft on or across Deschutes County right-of-way. A de-
'ai e tlUescription and map of this operation must be provided on the reverse side of
this sheet. This permit is subject to the following general specifications and is
revocable at any time upon written notice by the Deschutes County Court.
G12-12R.AL SPECIFICATIONS FOR P,^LRTICULriR I 'STALL%TIONS
I�sMM22a l_l 11 L ne ara e :� 2� ;'. , All pipe lines running
r.trallel zrith the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be :in
otualled to a depth to be no less than two (2) feet and properly backfilled to the
original grade line and with no obstructions to the drainage area. Permittee shall
be responsible for any or all damages to the existing pavement, and shoulders or
otl,hsr objects or areas within the right-of-way.
Ins-`.alling Pipe Line Transverse: All pipe line ins ha.11,n+i on—
laid transversely to the road bed or right-of-way shall be installed in the follo•v;-Lng
rranner: All pavement cuts prior to excavation shall be made with a breaking ba.mmer
so as to insure neat finish cut lines. All pipe lines shall be installed to a depth
of no less than two (2) feet below the existing roadside ditch elevation. In all
cases where a water line is installed in a transverse direction the water pipe must
lie installed within a larger pipe which size shall be no less than six (6) inches ire
d-'ameter. Backfilling and Paving: The permittee shall be required to properly back --
fill the trench in such a manner as to guarantee a well compacted, stabilized sub-
base prior to paving. The 'pavement must be replaced to its original line, crown,
and grade with an asphalt mixture to conform with the surrounding road bed. The
area of installation must be kept smooth for the traveling public at all times. The
permittee will be required at all times to take every precaution to protect the
graveling public. All signs and traffic controls shall be furnished by the permit-
tee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be run
under ground, with one exception: It would not be necessary to have these lines
within a larger pine rhen cr ssing _ the right-of-way.
at
taw U
reco ended Approval
Approved Count Court: Charles L. Plurmn" er Ron(Ima.st-or
pf Y DESCIITtm 13 MIN
1Y
COJMY JUDGE
14i �
,oUffY" C91LISSION.ER
'VOL 10 FAUE 516
11
m