10-518-Order Recorded 9/20/1966VOL 10 PAGE 518
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) ORDER
NQWMI a" U )
A permit is granted by Deschutes County to CU4= WS.
to Ans"U a 14swa PS Un on or across Deschutes County
right-of-way, A detailed description and map of this operation must be provided
on the reverse side of this sheet. This permit is subject to the following gen-
eral specifications and is revocable at any time upon written notice by the
Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: All pipe lines running
par el with the road s all be in the existing ditch line, or no less than twee
(3) feet from the edge of the existing pavement edge. All pipe lines must be
installed to a depth to be no less than two (2) feet and properly backfilled to
the original grade line and with no obstructions to the drainage area. Permittee
shall be responsible for any or all damages to the existing pavement, and
shoulders or other objects or areas within the right-of-way.
Ra�� = Line TransversetA
:
lations laid transversely to the a bWAYA—mr-tight-of-way shall be installed in
the following manner: All pavement cuts prior to excavation shall be made with
a breaking hammer so as to insure neat finish cut lines. All pipe lines shall
be installed to a depth of no less than two 42) feet below the existing road-
side ditch elevation. In all cases where a water line. 3.6 installed in a trans-
verse direction the water pipe must be installed within a larger pipe which s3.ze
shall be no less than six (6) inches in diameter. Backfilling and Paving: The
permittee shall be required to properly backfill the trench in such a manner as
to guarantee a well compacted, stabilized sub -base prior to paving. The pave-
ment must be replaced to its original line, crown, and grade with an asphalt
mixture to conform with the surrounding road bed. The area of installation
must be kept smooth for the traveling public at all times. The permittee will
be required at all times to take every precaution to protect the traveling
public. All signs and traffic controls shall be furnished by the permittee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be
run under ground, with one exception: It would not be necessary to have these
lines within a larger pipe when crossing the right-of-way.
Dated this �d day of 196 G.
..)VIZION�,,.
1i�, I-il
•ffg
Recommended Approval
Charles L. Plummer,
DESCHUTES COUNTY ROADMASTER
CAN=
COUN COM • �1
� r
• f I' M 91' 'JI' ��
Fo rm No. 31 � Rev. 1-66
CASCADE NATURAL GAS CORPORATION
SERVICE INSTALLATION • REPORT VOL WE��� R
a
PLAT I I
X)k`�14 K
DESCRIPTION
Name{' ` /
��
E. R. Number-` '' ' ` , Service
Service completed
Constructed by
Test pressure by
line No.
Address �`�- "= �=`'
Town '. • � ,�' /S!)
Total connected BTU "� ? ' ,j
Footage earned
'f�
Actual footage from P. L.
Estimated footage from P. L.
ervice
Type service-
4
Initiated by
IRees
Dote
Total house piping
Remarks I/
_
Sales lalive
1! � `-- '1,, "
Approved by 74
Head Service
` ate
n
PLAT I I
X)k`�14 K