10-590-Order Recorded 11/9/1966VOL 10 PAGE 590
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
i;% i
In the Matter )
Of ORDER
PRIVATE ACCESS )
A permit is granted by Deschutes County CARL'WMARD
to construct a private access on or across Deschutes County right-of-way. A
detailed description and map of this operation must be provided on the reverse
side of this sheet. This permit is subject to the following general specifica-
tions and is revocable at any time upon written notice by the Deschutes County
Court.
GENERAL_SPECIFICATIONS FOR PARTICULAR MTALLATIONS
-ghe.per�tee--1e�}=be-1�Cge:ree�-lie-eeeer�e-e-®s:rn.x
rule and regulations pertaining to the moving. -of b gs•
The perms shall be required to move the building on pneumatic do s evenly
spaces so as to-Isagre an even weight distribution, and proper Dred so as to
prevent collapse whi the process of moving. The pee�-shall be respon-
sible for all traffic warn- to the traveling pub a- as may bb -necessary to
insure safe travel while in the cess of mo a building;" The permittee
shall be required to have at least pilot cis equipped with signs
depicting "Wide Load"i and all the ss• .gns and flagmen at -.all intersec-
tions so as to insure an even J'AMRW of the traf d prevent congestion. The
permittee will be held ly responsible for a nd all,,:damage to the
existing pavement shoulder areas, and will be req `'to repair said
damage or pay d es to Deschutes County for the necessary repa If during
the course moving, it is necessary to move bridge railings, the ttee
shal required to replace the railings to their original state. --The saftsg
-ca€-i�c►$t$•e►e�-rem-nab-fie•-�t�.
Cloverdale Marlwt Road
Private Access to County Road: The permittee will be required Lto..-construct_the
301 private access at the safest and most practical point of
entry. The size of the access must be noted on the map. If there is obvious
need for a culvert, the proper size and length must be determined, and also put
on the map. The permittee will be responsible for the construction of the
access and all the costs of the materials used in the access.
If at any time this installation in any way impedes -the progress and future
maintenance or construction, the permittee will be required to move this instal-
lation at his own expense. Deschutes County will assume no responsibility for
damage to said installation as a result of maintenancelor construction. Failure
of permittee to comply with performance of work will result in a charge for
work performed by Deschutes County. '
Dated this _day
Recommended Approval:
Charles L. Plummer, Roadmaster-
DESCHUTES COUNTY
Approved
Coun Court: `
COUNTY JUDGE
By: C "
PERM—TTEE
vol 10 ME 591