Loading...
10-605-Order Recorded 11/21/1966In Reply To: 7140 VOL 10 ?AGE 64 IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter Of ) ORDER Access Roads A permit is granted by Deschutes County United States Forest Servic# to construct access roads on or across Deschutes County right-of-way, A detailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifica- tions and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS r - - - - - r and regulations pertaining to the moving of buildings. The perp a shall be required to move the building on pneumatic dollies evenly spaces so as nsure an even weight distribution, and properly shored so as to prevent collapse w in the process of moving. The permittee shall be respon- sible for all traffic w s to the traveling public, as may be necessary to insure safe travel while in rocess of moving the building. The permittee shall be required to have at lea o (2) pilot cars equipped with signs depicting 1%dde Load"p and all the neces signs and flagmen at all intersec- tions so as to insure an even flow of the tr and prevent congestion. The permittee will be held directly responsible for and all damage to the existing pavement and shoulder areas, and will be r ed to repair said damage or pay damages to Deschutes County for the necessary rep If during the course of moving, it is necessary to move bridge railings, ermittee shall be required to replace the railings to their original state. The ng Construct two access road on the Paulin - Bast Lakes Road Private Access to County Roads The permittee will be required to construct the access at the safest and most practical point o entry. The size of the access imrst be noted on the map. If there is obvious need for a culvert, the proper size and length must be determined, and also put on the map. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress and future maintenance or construction, the permittee will be required to move this instal- lation at his ovn expense. Deschutes County will assume no responsibility for damage to said installation as a result of maintenance or construction. Failure of permittee to comply with performance of work will result in a charge for work performed by Deschutes County. Dated this day ofWrk&'a� 1966 Rec/� Ap o Charles L. Plummer, Roadmaster - DESCHUTES COUNTY t• � • i �: r � � �• INIM STAM DVA T OF AGRICULTM Forest Service PERMITTEE 2 SW 1/4 SE 1/4 To HVVY 97 PAULINA LAKE HVVY N\/V 1/4 NE 1/4 ► ► .. . .... I ► ,---'PRO POS /,ACCESS RR GRA PROPOSE ACCESS -A RR GRADI