,,A permit ii _granted by`.Deschutes County to CARL P
to MOVE A' + ,$� � . .DII(O Fort ` Des6hutes County right=of-way. A de-
tailed descr pt on -an,, map of thin operation i}iust be provided on the reverse side of
this sheet. This permit.'is subject to the following general specificati' s and is
r.... - ..r ,.
revocable at-� ny'time°tdgtn written'nitice by°`the b6schut$s CfurAy'Coux�£.'.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Moving of Buildings: The permittee shall be required to observe the following rules
and regulations pertaining to the moving of buildings. The
permittee shall be required to move the building on pneumatic dollies eamly spaced
se as to insure an even weight distribution, and properly shored so as to prevent
ccllapse while in the process of moving. The permittee shall be responsible for all
traffic warnings to the traveling public, as may be necessarry to insure safe travel
while in the process of moving the building. The permittee shall be required to have
at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the
necessary signs and flagmen at all intersections so as to insure an even flow of the
traffic and prevent congestion. The permittee will be held directly responsible for
any and all damage to the..existing pavement.and shoulder-:-areas,,and will be required
to repair said damage, or pay damages to Deschutes County for the necessary repairs.
If during the course of moving it is necessary to move bridge railing, the permit-
tee shall be required to replace the railing to their original state. The sawing
off of posts and railing will not be permitted.
Private Access to County Road: The permittee will be required to construct the
access at the sofest and most practical point of
entry. The size of the access must be noted on the map. If there is obvious need
for a culvert, the proper size and length must be determined, and also put on the
map. The permittee will be responsible for the construction of the access and all
the costs of the materials used in the access.
If at any time this installation in any way impedes the progress of future main-
tainance or construction, the permittee will be required to move this installation
at his own expense. Deschutes County will assume no responsibility for damage to
said installation as result of maintainance or construction. Failure of permittee
to comply with performance of work will result in a change for work performed by
Deschutes County. ,'1
Dated thia� day 0f 1965.
Approve Cqtgn Cour
COUNTY JUDGE
COU _I IONS
COUNTY COIa1.ISaIONER
ke c ended Ap royal;
Charles L. Plummer, Roadmaster