Loading...
9-338-Order Recorded 2/1/1965VOL gfir J In the Matter of IN THE COUNTY COURT OF THE STATE CF OREGON FOR THE COUNTY OF DESCHUTES Instal Iation of Pipe Line ) O R D E R ) A permit is granted by Deschutes County ti the City of Redmond to install a four inch (411) pipeon or across Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this ,Sheet. This permit is subject to the following general specifications and is revzca.ble at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS zns+a.llinR Pije,_Line Parallel: Four inch (0) pipe line All pipe lines running para.ll_el wit''n the read shall be in the existing ditch line, or no less than three (3) feet fre,n the edge of the existing pavement edge. All pipe lines trust be in- :.a.lled to a depth to be no less than two (2) feet and properly ba.ckfilled to the Sri ,ir.!a _ {ride line and with xis*lt3thfietichot6i,thC -dcai,,Iage area.' Permittee shall rest^rSible for any or all damages to the existing pavement, and shoulders or, -aer chjec's or areas within the right-of-way. A1n_ 1 Pipe Line Transverse: All pipe line installations laid~trarn,v_-rsely is the rowd bed or right-of-way shall be installed in the following manner: 11 pavement cuts prior to excavation shall be inadb ffg1th anbbbaking hammer so as t- insure neat finish cut lines. All pipe lines shall be installed to a depth nc, less tha,a two (2) feet below the existing roadside ditch elevation. In all cases where a water line is installed in a transverse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in di.a,meter. ck'f i.lling and Pavip&: The permittee shall be required to properly back- fill the trench in such a manner as to guarantee a well compacted, stabilized sub- base r~i^r to paving. The pavement must be replaced tc. its original line, crown, and -rade i:rith an asphalt mixture to conform with the surrounding read bed. The a~ca installation must be kept smecth for the traveling public at all times. The permittee will be required at all times to take every precaution to prrtect the traveling public. All signs and traffic controls shall be furnished by the permit- regar~ t,, r, ther utility installatitns, such as gas lines, telephone lines, and electric crnduits, all the general specifications shall apply if they are tr be run under cr&und, with ene exception: It would not be necessary to have these lines within a, l.arger pipe when crossing the right-o£-way. February 17., 1965 Recommended Approval Charles L. Plummer, Roadmaster DESCHUTES COUNTY npproved urt: (For City of Redmond CO JV: C ""I` IUi COU Tl CflTW1ISSIOIVP~ V `l t_ i VOL PacE 339 Permit to install a four (4) inch pipe line and necessary pipe and fitting to adjacent property lines along the south line of Volcano Street as platted in Brownts First Addition, Deschutes County, Oregon more particularly de- scribed as follows: Beginning at a point on the west line of 19W Street which point is sixteen (16) feet north of the south line of Volcano Street; thence, easterly along a line parallel to and sixteen (16) feet from the south line of Volcano Street to the westerly right-of-way line of the Old Dalles-California State Highway. 1500 1400. i 27$.41' 3300 N u j 5 N N '4 h 290 .n s.9ae,.,:a•. w., ~as~.e 3600 = O /i n N ^ ■ 3700 140 PLI 4100 STREET a 1 I sod' I •eoe' I (.o• I ~ I s5' .~at~ ~ ~«-'ere•r~ ~ . ~ ♦~t'eT~ ~ . ~ a-e'a"rc . ~ ~ ~tr'a"r . ~ . ~+~i+r+ ~ ~ 1e•' 100 0 '°$900 -,,.Ie48C I L= w e F a J e' 1L DO 7.e' 520 5300 n 5 ; FO Yr 55005 7 j 6" 4500 w \ 'Not 4 Q