9-340-Order Recorded 2/17/1965VOL 9 'AGE 34 19
IN THE COUNTY COURT OF THE STATE CF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter )
of ) ORDER
Installing two inch }
}
Gas Line
A permit is granted by Deschutes County to Cascade Natural Gas
to install 2" gas line on or across Deschutes County right-of-way. A de-
tailed description and map of this operation must be provided on the reverse side of
this Sheet. This permit is subject to the following general specifications and is
revocable at any time upon written rotice by the Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Installing Pipe Line Parallel: 211 All pipe lines running
parallel with the read shall be in the existing ditch line, or no less than three
feet frnm the edge of the existing pavement edge. All pipe lines must be in-
s"alled to a depth to be no less than two (2) feet and preperly ba.ckfilled to the
:lr. ig-,i na i grade line and with obs*br3thn.oiichot4l.thdi~drgi,-lage area. Permitt ee sh.a.11
c resr,ncible for any or all damages to the existing pavement, and shoulders or
t'.ler ct,s or areas within the right-of-way.
P:i-ce Line Transverse: 2" All pipe line installatic_-),_,
laid-t•r,ns rscly to the roved bed it right-of-way shall be installed in the followinb
ma.= x, ...1 tea,ement cuts prior to excavation shall be IImd€3 irlth s.r_bbbaking hammer
so a~ to ingure neat finish cut lines. All pipe lines shall be installed to a depth
n J_,as than two (2) feet below the existing roadside ditch elevation. In all
caseF w'aere a, water line is installed in a transverse direction the water pipe must
b'~ installed within a larger pipe which size shall be no less than six (6) inches in
diameter. ta~ckfiillin and Paving: The permittee shall be required to properly back-
fill- the trench in such a manner as to guarantee a well compacted, stabilized sub-
base prr,r to paving. The pavement must be replaced tc its original line, crown,
and Trade with an asphalt mixture to conform with the surrounding road bed. The
area. ~ installation must be kept smooth for the traveling public at all times. The
rernittee wi?_l be required at all times to take every precaution to protect the
traveling public. All signs and traffic controls shall be furnished by the permit-
J.
n
in rear-l tn rather utility installations, such as gas lines, telephone lines, and
electric ocnduits, all the general specifications shall apply if they are t4 be run
under Freund, with r.ne exception: It would nmt be necessary to have these lines
within a larger pipe when crossing the right-of-way.
Recommended Approval
February 17, 1965
Charles L. Plu!nyner, Roadmaster
DESCHUTES COUNTY
Appr~+zr~d L,°~^n~3r urt: ~i~j
LJ,JN, V. UN .M
COUN'T'Y C01,27SSIONEP
4~q
FERNi E
This matter coming before the Court upon the petition of Cascade Natural
Gas, requesting permission to install a tyro inch (2") gas line in Town-
ship 15, Range 13, more particularly described as follows: Beginning at
a point approximately sixty (60) feet west of the junction of the NW
Market Road and Black Butte Blvd., and running: thence, east, parallel
to Black Butte Blvd. a distance of 1430 feet to a point approximately
sixteen (16) feet west of the intersection of South 15th Street and Black
Butte Blvd.; thence, north, transversing Black Butte Blvd. a distance of
thirty-four (34) feet; thence, running in a southwesterly direction paral-
lel to Black Butte Blvd. a distance of 855 feet to the existing gas line
east of South Canyon Drive.