Loading...
10-116-Order Recorded 1/19/1966VOL 1.0 PAGE IN THE COUNTY COURT OF THE STATE OF OREGON FOR THL COUNTY OF DESCHUTES In -the Matter ) of ) ORDER yFIF ��4 1�9 46, PRIVATE ACCESS ROAD y�� ,966 A permit is granted by Deschutes County to KEN NORTHEY COC to construct an access road ontar Deschutes County right-of;14 A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOP, PARTICULAR INSTALLATIONS and regulations pertaining to the moving of buildings. The permitte 11 be required t• move the building on pneumatic dollies evenly spaced so as to insure even weight distribution, and properly shored so as to prevent ccllapse while in the cess cf moving. The permittee shall be responsible for all traffic warnings to the tra public, as may be necessarry to insure safe travel while in the process of moving th '.lding. The permittee shall be required to have at least two (2) pilot cars equipped wi ' ns depicting -"Wide Load", and all the necessary signs and flagmen at all intersectio o as to insure an even flow of the traffic and prevent congestion. The permittee will eld directly responsible for any and all damage to the existing pavement.and shoulder .-a s 'andwill be required to repair said damage, or pay damages to Deschutes County for t 71 cessary repairs. If during the course of moving it is necessary to move bridge railing, permit- tee shall be required to replace the railing to their original state. The s Private Access to County hoad: The permittee will be required to construct the access at the sefest and most practical point of entry. The size of the access must be noted on the map. If there is obvious need for a culvert, the proper size and length must be determined, and also put on the map. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress of future main- tainance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as result of maintainance or construction. Failure of permittee to comply with performance of work w11 result in a change for work performed by Deschutes County. Approo�ved�Count-' urt l COUNTY JUDGE t:5f- =0— - COUNTI.I ONER COUNTY COI,17ISaIONER Iieex ended Approval Charles L. Plummer, Roadmaster DESCHU'I'ES COUNTY P Ec,MITTEE