Loading...
9-413-Order Recorded 5/19/1965Vol, 9 wE 413 IN THE COUNTY COURT OF THE STATE CF OREGON FOR THE COUNTY OF DESCHUTLS In the 3,L?ttar of ) ORDER Installing pipe line across a County Road A permit is granted by Deschutes County to Brooks-Willamette Corporation to install a pipe line on or across Deschutes County right-of-way. A de- tailed :description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS,FOR PARTICULAR INSTALLATIONS Tnsta-llir~p ip^ Line Parallel: All pipe lines r _ o parallel with the read shall be in the existing ditch line s han three (3) feet frr.:n the edge of the existing pavement pipe lines must be in- stalled to a depth to be no less t feet and properly ba.ekfilled to the nrig.in.a,l gr:adQ line a s-6 hsttiiokiohotbi~thdi-dta3_-cage area. Permi.ttee sb.all he =^c~sp _ or any or all damages to the existing pavement, and shoulders cr Ier "ieots it areas within the right-of-way. I ts. inPz P _oe Line Transverse: 12" culvert All pipe line installatia-if lacl~trar,st~rsely to the road bed er.right-of-way shall be installed in the following; manner: Ali pavement cuts prier to excavation shall be inadb:-.*1tR ir..btbaking hammer so a to insure n,>at finish cut lines. All pipe lines shall The installed to a depth :i n^t;ss tha:x trio (2) feet below the existing roadside ditch elevation. In all cosec vrhere a, water line is installed in a transverse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diareter, hackfillirg and Pavia : The permittee shall be required to properly back- the tre,lch in such a manner as to guarantee a well compacted, stabilized sub- base prier to paving. The pavement must be replaced tc, its original line, crown, and grade with an asphalt mixture to conform with the surrounding rad bed. The area ^i installation must be kept smooth for the traveling public at all times. The oermittee w-1.11 be required at all times to take every precaution to protect the, traveling public. All signs and traffic controls shall be furnished by the permit- tee, T In regar,. tc ether utility installations, such as gas lines, telephone lines, and electric conduits, all the general specifications shall apply if they are to be run -ande.r ground, with one exception: It would not be necessary to have these lines within a. larger pipe when crossing the right-ef-way. r n~~d Ap rc arle L. Plummer, Roadma.ster Dated this 19th day of May, 1965. DESCHUTES COUNTY Appr°;ved C int urt• C0",' --JUDi ,E ',183 ER COUNT' COMISSIONER EMMITTEE Said pipe line to be installed at a point approximately 800 feet from the intersection of Antler. Street and XcCaffery Road on that part under construction in Deschutes County, Oregon*