9-464-Order Recorded 6/2/1965UCH 9 PAGE 464
IN THE COU ril CO's-,,P OF THE STATE OF OREGON
FOR THI} C03,177 CF DESOHUIES
In the Matter
of a
Private Acdess Road )
A permit is granted by
to construct an access road
tailed description and map of this
this sheet. This permit is subject
revocable at any time upon written
O R D E R
Deschutes County to DALE MCMM
on or across Deschutes County right-of-way. A de-
operation must be pre:vided on the reverse side of
to the following general specifications and is
notice by the Deschutes County Court.
C2NERAL SPECIFICATIONS FOR PARTICULIR INSTALLATIONS
Moving of buildings: The permittee shall be required to observe the following rules
and regulations pertaining to the moving of buildings; The
permi.ttee shall be required to move the building on pneumatic dollies exonly spaced
si as to insure an even weight distribution, and properly shored so as to prevent
collapse while in the process of moving. The permittee shall be responsible for all
traffic warnings to the traveling public, as may be necessarry to insure safe travel
while in the process of moving the building. she permittee shall be required to have
at least two (2) pilit cars equipped with signs depicting "Wide Load", and all the
necessary signs and flagmen at all intersections so as to insure an even flow of the
traffic and prevent ccngesti-in. The permittee will be held directly responsible for
any and all damage to the.existing pavement and shouloer•.-areas, and will be required
to repair said damage, or pay damages to Deschutes County for the necessary repairs.
If during the course of moving it is necessary to move bridge railing, the permit-
tee shall be required to replace the railing to their original state. The sawing
off of posts and railing will not be permitted.
Private Access to County hoad: The permittee will be required Go construct the
access at the sofest and most practical point of
-:ntry. The size of the access must be noted on the map. If there is obvious need
for a culvert, the proper size and length must be determined, and also put on the
aap. The permittee will be responsible for the construction of the access and all
the costs of the materials used in the access.
If at, any time this installation in any way impedes the progress of future main-
-
ainance or construction, the permittee will be required to move this installation
at his own expense. Deschutes County will assume no responsibility for damage to
said installation as result of maintainance or
to comply with performance cf work will result
Deschutes Ccunty. The permi.ttee will provide
r
Dated this =~Lday of , 1965.
V
P-pproved Count, 'Cou t
COUNT JUDGE
COfY .ISS P*P'
construction. Failure of permittee
in a change for work performed by
the necessary culvert.
h.e o ended pro l:
Charles L. Plummer Roadmaster
DESCHUTES COUNTY
Pt1c,MITTE'E
COUNTY C01 .I&MNER
Vol 9 PmE 465
O
M
WA RD _ R OAD
N o° nom' 17" E
~CUIVe.rt
0 20'
- o Mc ME EN- ACCESS
S CC 31 e I" = 30
Al 1 in -7. ! R S., R.'2 F.W.M.
L