Loading...
9-464-Order Recorded 6/2/1965UCH 9 PAGE 464 IN THE COU ril CO's-,,P OF THE STATE OF OREGON FOR THI} C03,177 CF DESOHUIES In the Matter of a Private Acdess Road ) A permit is granted by to construct an access road tailed description and map of this this sheet. This permit is subject revocable at any time upon written O R D E R Deschutes County to DALE MCMM on or across Deschutes County right-of-way. A de- operation must be pre:vided on the reverse side of to the following general specifications and is notice by the Deschutes County Court. C2NERAL SPECIFICATIONS FOR PARTICULIR INSTALLATIONS Moving of buildings: The permittee shall be required to observe the following rules and regulations pertaining to the moving of buildings; The permi.ttee shall be required to move the building on pneumatic dollies exonly spaced si as to insure an even weight distribution, and properly shored so as to prevent collapse while in the process of moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessarry to insure safe travel while in the process of moving the building. she permittee shall be required to have at least two (2) pilit cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all intersections so as to insure an even flow of the traffic and prevent ccngesti-in. The permittee will be held directly responsible for any and all damage to the.existing pavement and shouloer•.-areas, and will be required to repair said damage, or pay damages to Deschutes County for the necessary repairs. If during the course of moving it is necessary to move bridge railing, the permit- tee shall be required to replace the railing to their original state. The sawing off of posts and railing will not be permitted. Private Access to County hoad: The permittee will be required Go construct the access at the sofest and most practical point of -:ntry. The size of the access must be noted on the map. If there is obvious need for a culvert, the proper size and length must be determined, and also put on the aap. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at, any time this installation in any way impedes the progress of future main- - ainance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as result of maintainance or to comply with performance cf work will result Deschutes Ccunty. The permi.ttee will provide r Dated this =~Lday of , 1965. V P-pproved Count, 'Cou t COUNT JUDGE COfY .ISS P*P' construction. Failure of permittee in a change for work performed by the necessary culvert. h.e o ended pro l: Charles L. Plummer Roadmaster DESCHUTES COUNTY Pt1c,MITTE'E COUNTY C01 .I&MNER Vol 9 PmE 465 O M WA RD _ R OAD N o° nom' 17" E ~CUIVe.rt 0 20' - o Mc ME EN- ACCESS S CC 31 e I" = 30 Al 1 in -7. ! R S., R.'2 F.W.M. L