Loading...
9-466-Order Recorded 6/22/1965VOL 9 PAGE 466 IN THE COUNTY COLTtT OF THE STATE OF OREGON FOR THL COUNTY OF DESCHUTES In the Katter ) J A permit is granted by to taile;k* t i tt#n 19 this this sheet. This permit is subject revocable at any time upon written O R D E R Deschutes County to ~ DWO Suit ► . on 9, ~ Deschutes County right-of-way. A de- operation must be provided on the reverse side of tc the following general specifications and is notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS uoving of Buildings: The permittee shall be required to observe the following rules and regulations pertaining to the moving of buildings. The permittee shall be required to move the building on pneumatic dollies emenly spaced so as to insure an even weight distribution, and properly shored so as to prevent collapse while in the process cf moving. The permittee shall be responsible for all traffic ti~arnings to the traveling public, as may be necessarry to insure safe travel while. in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all intersections so as to insure an even flow of the traffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the-existing pavement and shoulder areas, and will be required to repair-said damage, or pay damages to Deschutes County for the necessary repairs. If during the course of moving it is necessary to move bridge railing, the permit- tee shall be required to replace the railing to their original state. The sawing off of pasts and railing will not be permitted. Private Access to County Road: The permittee will be required to construct the access at the sofest and most practical point of s rp~Iv a size o a access must be noted on the map. If there is obvious need for a - ulvert, the proper size and length must be determined, and also put on the map. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress of future main- tainance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation ab result of maintainance or construction. Failure of permittee to comply with performance of work will result in a change for work performed by Deschutes County. Approved y urt COUNTY JUDGE COU OT V-'IS IONS he ended Appro~ra1 Charles L. Plummer, Roadmaster DESCHUT'ES COUNTY PEI': =TEE COUNTY COi-I.I86IONER