9-511-Order Recorded 7/22/1965VOL
IN THE COUNTY COUELT OF THE STATE OF OREGON
FOR THL COUNTY OF DESCHUTES
Tn tho VattPr }
}
of )
}
Moving a Building }
O R D E R
9 PAGE 511
Building will be moved July 1965
A permit is granted by Deschutes County to K. J. Holman
to a 241 X 301 building on ar-across Deschutes County right-of-way. A de-
t~.ilec description and map of this operation must be provided on the reverse side of
this sheet. This permit is subject to the following general specifications and is
revocable at any time upon written notice by the Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICLLd~STTALLATIONS
F r State Hwy. # 20 Fast on Erickson Road to e
iioving f L-ild_ inns: The permittee shall be required to observe the following rules
+ and regulations pertaining to the moving of buildings. The
permi.ttee shall be required to move the building on pneumatic dollies evenly spaced
st as to insure an even weight distribution, and properly shored so as to prevent
ccilapse while in the process of moving. The permittee shall be responsible for all
*.r^fTic warnings to the traveling public, as may be necessarry to insure safe travel
hile in t.,e process of moving the building. The permittee shall be required to have
at least t,,o (2) pilit cars equipped with signs depicting "bride Load", and all the
rec? eary signs and flagmen at all intersections so as to insure an even flow of the
traffic and prevent congestion. The permittee will be held directly responsible for
any and a-l damage to the_. existing pavement _and shoulder areas, and will be required
to repair said damage, or pay damages to Deschutes County for the necessary repairs..
If during the course of moving it is necessary to move bridge railing, the permit-
tee shall be required to replace the railing to their original state. The sawing
off of p:>sts and railing will not be permitted.
+tt c. tJG1111J.4G
access at the safest and most practical po' e
entry. The size of the access must be noted on the map. If there vious need
for a culvert, the proper size and length must be determined also put on the
nap. The permittee will be responsible for the const on of the access and all
the costs of the materials used in the access.
If at any time this installationan-
Zy way impedes the progress of future main-
ainance or construction permittee will be required to move this installation
at his own expense eschutes County will assume no responsibility for damage to
QJ,
said instals on as result of maintainance or construction. Failure of permittee
to c
with performance cf work will result in a change for work performed by
Dated this -,-2Z day of 1965.
hecommended Approval:
Charles L. Plummer, Roadmaster
DESCHU'IES COUNTY
approved C ut y urt
CO-U-11`11' JUDGE
COUPv Y C X11-ISSIONER
COUNTY 001-]~ ISSIONER
PEA i TTEE