Loading...
10-247-Order Recorded 3/23/1966VOL 10 fAGf247 IN THE COUNTY COU.T­2 OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the 11atter ) of a ) ORDER Pipe Line Transversing ) the Redmond Caves Road A permit is granted by Deschutes County to JAMES E. WHITEHEAD to install a water line tWqVP across Deschutes County right -of -pray. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GEITB,RAL SPECIFICATIONS FOR P ,RTICULt R I {aTALL%TIONS paralle road shall be in the existing ditch line, or no less than three (3) feet from the edge sting pavement ed -e. All pipe lines must be in- stalled to a depth to be no less t an feet and properly backfilled to the original grade line and with no obstructions to ea. Perrn.ittee shall be responsible for any or all damages to the existing pavement, ders or InstalliM Pipe Line Transverse: 1 3/4 inch water line All pipe line installation - laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking ha=er so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation. In all cases where a i^Tater line is installed in a transverse direction the water pipe mus;; be installed vi*=a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly bock - fill the trench in such a manner as to guarantee a well compacted, stabilized sub- base prior to paving. The pavement must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the graveling public. All signs and traffic controls shall be furnished by the perrdt- ,ee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary* to have these lines i•rithin a larger pipe when crossing the right-of-way. Dated this �5 day of 1966.R/ecommended /Approval / Approved County Court: Charles L. Plummer, Roa.cima.ster DE5CIITJT., S CnIINPY COUNTY JUDGE LGOUINITYI' ON i;QUN^l Y Oi s)3 S N R a O 1 V�k, fi m 0 o 3