9-531-Order Recorded 8/4/1965VOL 9 P4cE 531
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THL COUNTY OF DESCHUTES
Iu the hatter )
)
of ) ORDER
}
PRIVATE ACCESS )
A permit is granted by Deschutes County to R. R. MCDANIEL
to construct a private access on XMQMWM Deschutes County right-of-way. A de-
tailed description and map of this operation must be provided on the reverse side of
this sheet. This permit is subject to the following general specifications and is
revzcable at any time upon written notice by the Deschutes County Court.
:ENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
and regulations pertaining to the moving of buildings. vTh
permittee shall be required to move the building on pneumatic dollies ears spaced
s^ as to insure an even weight distribution, and properly shored -s to prevent
collapse wile in the process of moving. The permittee sha responsible for all
traffic yearnings to the traveling public, as may be n sarry to insure safe travel
while in the process of moving the building. ermittee shall be required to have
at least two (2) pil,t cars equipped wit gns depicting "Wide Load", and all the
necessary signs and flagmen at al ersections so as to insure an even flow of the
traffic and prevent congest' . The permittee will be held directly responsible for
any and a- ,l dam age to , . existing pavement .arid should-er-: areas, and will be required
to repair said .age, or pay damages to Deschutes County for the necessary repairs.
If Burin e course of moving it is necessary to move bridge railing, the permit -
t_ .all be required to replace the railing to their original state. The sawing
Private.-access onto the McCaffery County Road.
Private Access to County P~oad: The permittee will be required to construct the
access at the sofest and most practical point of
;nary. The size of the access must be noted on the map. If there is obvious need
for a culvert, the proper size and length must be determined, and also put on the
,-iap. The permittee will be responsible for the construction of the access and all
.he costs of the materials used in the access.
~'f at any time this installation in any way impedes the progress of future main-
:ainance or construction, the permittee will be required to move this installation
at his own expense. Deschutes County will assume no responsibility for damage to
said installation as result of maintainance or construction. Failure of permittee
to comply with performance cf work will result in a change for work performed by
Deschutes Ccunty.
Dated th,s day of ~ kCi 7- 1965.
pproved C un Co t
.J - 0~14~ 0TU-NT`i JUDGE
r, 71- QZ
.OT ~-l SI
t res end Appr val~
: Ie ` Roadmaster
DESCHUTES COUNTY
PE 'aMITTEE
COUNTY COLS ISSIONER
l
wz
u J1 N
nor
L
.
Q
O
cr-.
CC
W
LL
LL
Q
U
U
Ion