Loading...
10-312-Order Recorded 4/28/1966VEL 10 PAGE 312 IIu THE COU1, COUii2 OF THE STATE OF OREGON FOR THE COUNTY OF DSCHUTES In the Matter ) ) of ) ORDER NATURAL GAS LME ) A permit is granted by Deschutes County to CASCADE NATURAL GAS to install a gas line on or across Deschutes County right-of-way. Ade - tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. G02RAL SPECII'IC911IONS FOR P:LR.TICULIIR I ?3T,"ILLATIONS nstalli.ng Pipe Line Parallel: A 211 natural gas line All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be in- stalled to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with no obstructions to the drainage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right -of--wp.y. Installing Pipe Line Transverse: A 211 natural gas line All pipe line installation. laid transversely to the road bed or right-of-way shall be installed in the'following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation. In all cases where a water line is installed in a transverse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The peniittee shall be required to properly back fill the trench in such a manner as to guarantee a well compacted, stabilized sub- base prior to paving. The pavement must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be Dept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permit- tee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessanj to have these lines :•rithin a larger pipe when crossing the right -of -tray. Dated this fday of,4L,L 1966. Approved County Court: All COUNTY JUDGE Reco :upended Approval 'CGL Charles L. Plummer, Roa.dma.ster DESC11UT?S COUNTY �- -;e CASCADE NATURAL GAS COUNTY C0111ISSIONER COUNTY CO -1 ISSIONER P',+'Ri iIT ' VOL 10 PAGE 13 � s.