Loading...
9-561-Order Recorded 9/9/1965v01 9 PACE 561 IN THE COUNTY COUkT OF THE STATE OF OREGON FOR TH-LI COUNTY OF DESCHUTES In-the Katter ) of ) ORDER MOVING A BUILDING ) J A permit is granted by Deschutes County to R. J. HOLMAN to move a building on Namxwcom Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. Building to be moved September 13, 1965. C ENE~cgL SpECIFICATTpNS F R PAWtC L INST TI S Commencing aahytglt0 k Street and Hear xireek Road; fence ong a Beam Creek Road N 4ri~1 i tu~i L9I ee earmiteee -h l Deserequ nred tom obs revek t ed fo43 lloowing~r es es and regulations pertaining to the moving of buildings. The permittee shall be required to move the building on pneumatic dollies emenly spaced so as to insure an even weight distribution, and properly shored so as to prevent collapse while in the process cf moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessarry to insure safe travel while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all intersections so as to insure an even flow of the traffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the_existing pavement and shoulder-:areas,-and will be required to repair said damage, or pay damages to Deschutes County for the necessary repairs. If during the course of moving it is necessary to move bridge railing, the permit- tee shall be required to replace the railing to their original state. The sawing off of posts and railing will not be permitted. Private Access to County Load: The permittee will be required to construct the access.at the sofest and most practical point of entry. The size of the access must be noted on the map. If there is obvious need for a culvert, the proper size and length must be determined, and also put on the map. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress of future main- tainance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as result of maintainance or construction. Failure of permittee to comply with performance of work will result in a change for work performed by Deschutes County. Dated this42.0ay of , Approved o curt COUNTY JUDGE COUN 0 SIO ~a COUNTY COLKIaaIONER 1965. he c oended 1 L= '71 Z Charles L. Plummer, Roadmaster DESCHU'I'ES COUNTY