Loading...
9-569-Order Recorded 8/30/1965V01- -9 PAR 569 IN THE COUNTY COURT OF THE STATE OF OREGON FOR THL COUNTY OF DESCHUTES In'the Katter ) of ) ORDER Moving a BuiliBing ) ) A permit is granted by Deschutes County to CARL SPENCER to move a 38' X 241 building on or across Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. Moving the~u d3 ngPCowItud3oSRc~i PtoU].erSRoa;T-LOig the Butler pMaprket Movin t t Ri*ln' ecpermiltee shal eerequiirldalon9baerve~ ierfg ol owing rules ds. and regulations pertaining to the moving cf buildings. The permittee shall be required to move the building on pneumatic dollies emenly spaced so as to insure an even weight distribution, and properly shored so as to prevent ccllapse while in the process cf moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessarry to insure safe travel while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the necessary signs and flagmen at all intersections so as to insure an even flow of the traffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the. existing pavement .and shoulder--areas,- and will be required to repair said damage, or pay damages to Deschutes County for the necessary repairs. If during the course of moving it is necessary to move bridge railing, the permit- tee shall be required to replace the railing to their original state. The sawing off of posts and railing will not be permitted. The moving of the building will commence at 5:00 A. M., September 1, 1965. Private Access to County Road: The permittee will be required to construct the access at the sofest and most practical point of entry. The size of the access must be noted on the map. If there is obvious need for a culvert, the proper size and length must be determined, and also put on the map. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the proress of future main- C, or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assume no responsibility for damage to said installation as result of maintainance or construction. Failure of permittee to comply with performance of work will result in a change for work performed by Deschutes County. Dated this-5-70day of 965• Approve C yJC0 COUNTY JUDGE heftq endee~d//Appp v Ch aa rl~.'lucrimer fioadmaster DESCHUTES COUNTY PErcMITTEE CO TJ SSI COUNTY O ri:I&DIONER