Loading...
9-580-Order Recorded 9/9/1965von 9 PACE 1589 IN THE COUNTY COU1112 OF THE STATL OF OREGON FOR THE COUNTY OF D SCHUTES In the Flatter of ) ORDER REPAIRS TO A NATURAL ) GAS LINE CROSSING ) A permit is granted by Deschutes County to PACIFIC GAS TRANSMISSION COMPANY to make repairs to a gas line on or across Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet, This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GiN RAL SPECIFICATIONS FOR PiaTICUIdLR IYSTALLATIONS Permit to perform maintenance to the NELSON ROAD as set forth in this 'Order." para r he road shall be in the existing ditch line, or no less than three (3) feet from the e existing pavement edge. All pipe lines must be in- stalled to a depth to be no less feet and properly backfilled to the original grade line and with no obstructions to e area. Permittee shall be responsible for any or all damages to the existing pavement, dens qr Installing Pipe Line Transverse: All pipe line installations laid transversely to the road bed or right-of-way shall be installed in the following manner: All pavement cuts prior to excavation shall be made with a breaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation, In all cases where a water line is installed in a transverse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The periuttee shall be required to properly back- fill the trench in such a manner as to guarantee a well compacted, stabilized sub- base prior to paving. The pavement must be replaced to its original line, crown, .nd grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times to take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permit- tee. In regard to other utility installations, such as gas lines, telephone lines and electric conduits, all the general specifications shall apply if they are to be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Dated this~day of , 1965.RecoiLmended Approval. , / Approved County Court: Charles L. Pltumer, Roadmaster j DESCIiUTES COUNTY COUNTY JUDGE COUNTY IIA'SS ONZR COUNTY Coli STONER PACIFIC GAS TRANMISSION COMPANY PERig,TIM