9-580-Order Recorded 9/9/1965von 9 PACE 1589
IN THE COUNTY COU1112 OF THE STATL OF OREGON
FOR THE COUNTY OF D SCHUTES
In the Flatter
of ) ORDER
REPAIRS TO A NATURAL )
GAS LINE CROSSING )
A permit is granted by Deschutes County to PACIFIC GAS TRANSMISSION COMPANY
to make repairs to a gas line on or across Deschutes County right-of-way. A de-
tailed description and map of this operation must be provided on the reverse side of
this sheet, This permit is subject to the following general specifications and is
revocable at any time upon written notice by the Deschutes County Court.
GiN RAL SPECIFICATIONS FOR PiaTICUIdLR IYSTALLATIONS
Permit to perform maintenance to the NELSON ROAD as set forth in this 'Order."
para r he road shall be in the existing ditch line, or no less than three
(3) feet from the e existing pavement edge. All pipe lines must be in-
stalled to a depth to be no less feet and properly backfilled to the
original grade line and with no obstructions to e area. Permittee shall
be responsible for any or all damages to the existing pavement, dens qr
Installing Pipe Line Transverse: All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the following
manner: All pavement cuts prior to excavation shall be made with a breaking hammer
so as to insure neat finish cut lines. All pipe lines shall be installed to a depth
of no less than two (2) feet below the existing roadside ditch elevation, In all
cases where a water line is installed in a transverse direction the water pipe must
be installed within a larger pipe which size shall be no less than six (6) inches in
diameter. Backfilling and Paving: The periuttee shall be required to properly back-
fill the trench in such a manner as to guarantee a well compacted, stabilized sub-
base prior to paving. The pavement must be replaced to its original line, crown,
.nd grade with an asphalt mixture to conform with the surrounding road bed. The
area of installation must be kept smooth for the traveling public at all times. The
permittee will be required at all times to take every precaution to protect the
traveling public. All signs and traffic controls shall be furnished by the permit-
tee.
In regard to other utility installations, such as gas lines, telephone lines and
electric conduits, all the general specifications shall apply if they are to be run
under ground, with one exception: It would not be necessary to have these lines
within a larger pipe when crossing the right-of-way.
Dated this~day of , 1965.RecoiLmended Approval.
, /
Approved County Court: Charles L. Pltumer, Roadmaster
j DESCIiUTES COUNTY
COUNTY JUDGE
COUNTY IIA'SS ONZR
COUNTY Coli STONER
PACIFIC GAS TRANMISSION COMPANY
PERig,TIM