9-620-Order Recorded 10/12/1965VOL a} fi? 0
IN THE COUNTY COURT OF THE STATE OF OREGON
FOR THL COUNTY OF DESCHUTES
In-the-Matter
of ) ORDER
MOVING A , err
A permit is granted by Deschutes County to CAR. $'MCER
to move a building on or across Deschutes County right-of-way. A de-
tailed description and map of this operation must be provided on the reverse side of
this sheet. This permit is subject to the following general specifications and is
revocable at any time upen written notice by the Deschutes County Court.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
Moving of Buildings: The permittee shall be required to observe the following rules
and regulations pertaining to the moving of buildings. The
permittee shall be required to move the building on pneumatic dollies em mly spaced
so as to insure an even weight distribution, and properly shored so as to prevent
ccllapse while in the process of moving. The permittee shall be responsible for all
traffic warnings to the traveling public, as may be necessarry to insure safe travel
while in the process of moving the building. The permittee shall be required to have
at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the
necessary signs and flagmen at all intersections so as to insure an even flow of the
traffic and prevent congestion. The permittee will be held directly responsible for
any and all damage to the., existing pavement .and shoulder -areas, - and will be required
to repair said damage, or pay damages to Deschutes County for the necessary repairs.
If during the course of moving it is necessary to move bridge railing, the permit-
tee shall be required to replace the railing to their original state. The sawing
off of posts and railing will not be permitted.
access at the sofest and most practical point of
entry. ze of the access must be noted on the map. If there is obvious need
for a culvert, t o er size and length must be determined, and also put on the
map. The permittee wil esponsible for the construction of the access and all
the costs of the materials use he access.
If at any time this installation in any way i s the progress of future main-
tainance or construction, the permittee will be requ to move this installation
at his own expense. Deschutes County will assume no respon ity for damage to
said installation as result of maintainance or construction. Fai f permittee
to comply with performance of work will result in a change for work perfo b
Rec,Tmended Approval%
Dated tbis.Zday of CAL-, 1965
Charles L. Plummer, Roadmaster
DESCHUTES COUNTY
Approved Count- ourt
Af 1~ COUNTY JUDGE
PEFu~I E
~ -
COMA
CO
:ISSIONER
ER
This permit entitles CART, SPENCER to move abuilding on October 14, 1965,