Loading...
9-126-Order Recorded 5/20/19644 t 9 PAGE 1 6 P, IN THF. COUNTY COURT •F THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Platter of ) ORDER Installing Gas Lines Reed Market Road A permit is granted by Deschutes County to CASCADE NATURAL GAS to 34"' and 2" Gas Linea on or across Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Gourt. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS .Installing Pipe:Line Parallel: Two inch (2n) Gas Main All pipe lines running parallel with the road shall be in the existing ditch line, or no less than three (3) feet from the edge of the existing pavement edge. All pipe lines must be in- stalled to a depth to be no less than two (2) feet and properly backfilled to the original grade line and with abstbstbiaoJiototittbadrdiaigage area. Permittee shall be responsible for any or all damages to the existing pavement, and shoulders or other objects or areas within the right-of-way. Installing Pipe Line Transverse: 3/4 inch Gas Lines All pipe line installations laid transversely to the road bed or right-of-way shall be installed in the following manner: all pavement cuts prior to excavation shall be fnadb:-_*1td Ar..bbbaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation. In all cases where a water line is installed in a transverse direction the water pipe must be installed within a larger pipe which size shall be no less than six (b) inches in diameter. Backfilling and Pavin : The permittee shall be required to properly back- fill the trench in such a manner as to guarantee a well cmpacted, stabilized sub- base prior to paving. The pavement must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area of installation must be kept smooth for the traveling public at all times. The permittee will be required at all times tc take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permit- tee. In regard to other utility installations, such as gas lines, telephone lines, and electric conduits, all the general specifications shall apply if they are tv be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Appro d County, o t: COUNTY JUDGE r1l' COUNTY C0MPiISS`IONER R ended A.~p[V t.42~ Charles L. Plummer, Roadmaster DESCHU S COUNTY y X PERMITTEE COUNTY COlaviISSIONER X ol o ~ 0 Z i• 0 o~ 0 0 r s L n /0140 YO I (70 ~v E:l o~ vix m L O 4 rn w r 0 M 9 m A 1 ,o 1 o~ n O A y h io ry O~ b r~3 3 -1 tio s Y. ~ MI27 fln _r 3 Z D 7Q m O n~ V 1 Ai OPC OV) ♦ t QI ~ N* Za q .~A