9-143-Order Recorded 6/3/1964VOL IN THE COUNTY COURT OF THE STATE OF OREGON FOR THE COUNTY OF DESCHUTES In the Matter ) of ) ORDER Installation of Pipe Line ) 9 FACE x 43 A permit is granted by Deschutes County to David Mather to Install Water Line Whilacross Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject to the following general specifications and is revocable at any time upon written notice by the Deschutes County Gourt. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS _:o vc+ -_.iaK i 1~.JG: Liaic i ai CZJ--Lc.1. ts.i parallel with the read shall be in the existing ditch line, or han three (3) feet from the edge of the existing pavement pipe lines must be in- stiE to a depth to be no less t feet and properly backfilled to the orgrade line a sibsbbiaeki.oheti1ithilreLtaagage area. Permittee shall be or any or all damages to the existing pavement, and shoulders or Installing Pipe Line Transverse: (3) 11t, Water Lines All pipe line installations laid transversely to the read bed or right-of-way shall be installed in the following manner: all pavement cuts prior to excavation shall be inadb._?41td ir..btbaking hammer so as to insure neat finish cut lines. All pipe lines shall be installed to a depth of no less than two (2) feet below the existing roadside ditch elevation. In all cases where a water line is installed in a transverse direction the water pipe must be installed within a larger pipe which size shall be no less than six (6) inches in diameter. Backfilling and Paving: The permittee shall be required to properly back- fill the trench in such a manner as to guarantee a well compacted, stabilized sub- base prier to paving. The pavement must be replaced to its original line, crown, and grade with an asphalt mixture to conform with the surrounding road bed. The area if installation must be kept smooth for the traveling public at all times. The permittee will be required at all times tc take every precaution to protect the traveling public. All signs and traffic controls shall be furnished by the permit- tee. In regard to other utility installations, such as gas lines, telephone lines, and electric conduits, all the general specifications shall apply if they are t4 be run under ground, with one exception: It would not be necessary to have these lines within a larger pipe when crossing the right-of-way. Approved Cou/nt~_~urt: COUNTY JUDGE 16, COUNTY CON1iI` IONER COUNTY COlaviISSIONER R,ended Ap • al ie, Char e s s L ii er, Roadmaster DESCHUTES COUNTY PERMIT TEE Dated this 3rd day of June, 1964.