9-229-Order Recorded 9/18/1964VOL
IN TIM COUNTY COURT OF THE STATE OF OREGON
FOR THE COUNTY OF DESCHUTES
In the Matter
of
INSTALLING GAS LTNFS
O R D E R
STUDIO ROAD
9 PACE 229
BUTLER MARKET ROAD
A permit is granted by Deschutes County to Cpscade Netura.l Gas Co
to Install 2" & 14-" Lines on or across Deschutes County right-of-way. A de-
tailed description and -map if this op ration must be providted on the reverse side of
this sheet. This permit is subject to the following general specifications and is
revocable at any time upon written notice by the Deschutes County Gourt.
GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS
7rstallin Pipe: Line Parallel: Gas Line 2" & 4"' All pipe lines running
parallel with the road shall be in the existing ditch line, or no less than three
(3) feet from the edge of the existing pavement edge. All pipe lines must be in-
stalled to a depth to be no less than two (2) feet and properly backfilled to the
original grade line and with abs*babtfaokiotot6lith4lydi!.aagage area. Permittee shall
be responsible for any or all damages to the existing pavement, and shoulders or
other objects or areas within the right-of-way.
Installing Pipe Line Transverse: 2" & 5/4" Lines All pipe line installations
laid transversely to the road bed or right-of-way shall be installed in the following
manner: all pavement cuts prior to excavation shall be inad&-,_-'alai Ar.btbaking hammer
so as to insure neat finish cut lines. All pipe lines shall be installed to a depth
of no less than two (2) feet below the existing roadside ditch elevation. In all
cases where a water line is installed in a transverse direction the water pipe must
be installed within a larger pipe which size shall be no less than six (b) inches in
diameter. Backfilli.ng and Pavin : The permittee shall be required to properly back-
fill the trench in such a manner as to guarantee a well compacted, stabilized sub-
base prier to paving. The pavement must be replaced to its original line, crown,
and grade with an asphalt mixture to conform with the surrounding road bed. The
area of installation must be kept smooth for the traveling public at all times. The
permittee will be required at all times tc take every precaution to protect the
traveling public. All signs and traffic controls shall be furnished by the permit-
tee.
In regard to other utility installations, such as gas lines, telephone lines, and
electric conduits, all the general specifications shall apply if they are t4 be run
under ground, with one exception: It would not be necessary to have these lines
within a larger pipe when crossing the right-of-way.
Recommended Approval
sl Charles L. Plu mer
harles L. Plummer, Roadmaster
DESCHUTES COUNTY
Approved Ceun ourt:
COUNTY JUDGE
COUNTY COMNISS ONER
COUNTY CODIiISSIONER
PERMITTEE - lyy0~