9-230-Order Recorded 9/18/1964IN THE COUNTY COURT OF THE STATE OF OREGON FOR THL COUNTY OF DESCHUTES In the Natter of NOVING BUILDMOS ) O R D E R j RIL TRAM MPCO. A permit is granted by Deschutes County to Rol man Trenofor Co. to Move Puddings on or across Deschutes County right-of-way. A de- tailed description and map of this operation must be provided on the reverse side of this sheet. This permit is subject tc the following general specifications and is revocable at any time upon written notice by the Deschutes County Court. GENERAL SPECIFICATIONS FOR PARTICULAR INSTALLATIONS Moving of Buildings: The permittee shall be required to observe the following rules and regulations pertaining to the moving of buildings. The permittee shall be required to move the building on pneumatic dollies euenly spaced so as to insure an even weight distribution, and properly shored so as to prevent collapse while in the process cf moving. The permittee shall be responsible for all traffic warnings to the traveling public, as may be necessarry to insure safe travel while in the process of moving the building. The permittee shall be required to have at least two (2) pilot cars equipped with signs depicting "Wide Load", and all the ;.iec: sary signs and flagmen at all intersections so as to insure an even flow of the tr<~.ffic and prevent congestion. The permittee will be held directly responsible for any and all damage to the existing pavement and shouloer.-areas,..and will be required to repa-r said damage, or pay damages to Deschutes County for the necessary repairs. If during the course of moving it is necessary to move bridge railing, the permit- tee shall be required to replace the railing to their original state. The sawing off of posts and railing will not be permitted. I# . w The permittee gal ~ be required to construct the access at the sofest and most practical point of entry-, The size of the access must be noted on the map. If there is obvious need for a culvert, the proper size and length must be determined, and also put on the map. The permittee will be responsible for the construction of the access and all the costs of the materials used in the access. If at any time this installation in any way impedes the progress of future main- tainance or construction, the permittee will be required to move this installation at his own expense. Deschutes County will assLme no responsibility for damage to said installation as result of maintainance or construction. Failure of permittee to comply with performance of work will result in a change for work performed by Deschutes County. Appr ,~-e ,Xfty ourt COUNTY JUDGE COUNTY CONE"ISSIONER COUNTY COI~I.ISSIONER Fte ended Appr, a1"~ ,r`ar es L. Plummer oadmaster s DESCHUTES COUNTY Pn,`cM TEE a` /